MILabs
Build

KPI scorecard for architecture and design firms

A KPI scorecard for architecture and design firms that brings utilisation, fee income and open project work into one view for the principal to review.

Updated 2026-09-13

Why Architecture and design need a kpi scorecard

Architecture and design firms carry much of their performance in the heads of principals and project leads. Fee income depends on whether phases are billed as they finish, utilisation depends on whether hours land against the right jobs, and the pipeline depends on how many enquiries turn into meetings. Those figures usually exist, but they come from different places and are rarely compared side by side. A scorecard gives the principal one agreed set of measures for the whole business. For a firm where most staff time is billable to a phase rather than a retainer, the most useful measures tend to be fee earned against fee budget, hours by project stage, and the amount of work waiting on a client decision. Agreeing the definition of each one before the dashboard is built keeps the design team and the finance function working from the same numbers.

KPI scorecard: Architecture and design in plain language

A key performance indicator is a number that shows whether something important is moving the right way. In an architecture or design firm, that might be the share of hours that reaches a client invoice, the fees left unbilled after a phase closes, or the number of drawing packages awaiting sign-off. A scorecard gathers a small set of these on one screen, so a reader can scan them quickly and decide where to look closer.

Most of the difficulty lies in agreeing what each figure means. Two people can both say utilisation and mean different things, one counting only design hours and the other including site visits and model checking. Writing down each measure, with its formula, source and owner, settles that before any chart is drawn.

Business intelligence tools such as Power BI, Looker Studio and Metabase display these figures. They read from a source, calculate each measure and show the result, while the meaning of each measure stays a decision for the firm. When a number looks unexpected, the reviewer goes back to the underlying record, which is why the sources need to be known and stable.

Features for this industry

  • Fee earned against fee budget for each phase of a project
  • Hours logged by project stage, including unassigned time
  • Work waiting on a client or consultant decision, grouped by project
  • Proposal win rate split by building type and sector
  • Pipeline view from enquiry to first meeting to appointment
  • Variation fees raised compared with fees invoiced

At a glance

BuildKPI scorecard
IndustryArchitecture and design
Complexitymoderate
ToolsMicrosoft Power BI, Looker Studio, Metabase
First release
  • Written definitions for each measure, covering formula, source and owner
  • Connections to the accounting, client management and spreadsheet sources that hold the figures
  • One dashboard page showing current values, the prior period and direction of travel
  • A scheduled refresh so figures update without manual copying
  • Threshold alerts when a measure moves outside a range the owner sets

Examples

Fee budget tracking across phases

A principal opens the scorecard to compare fees earned on each active project with the phase budget agreed in the appointment letter. Projects where earned fee is running ahead of completed stages are flagged for a conversation about scope before the next phase begins.

Utilisation by team and sector

Billable hours are compared with capacity for each designer and technical staff member, split by building type. The scorecard shows where senior hours are carrying work that could be delegated, and where capacity is free for a new appointment. The figures prompt a staffing discussion rather than settling it.

Win rate across competitive bids

After each competitive interview, the principal records whether the firm was shortlisted, appointed or unsuccessful, along with the fee bid. Across past submissions, the scorecard shows which building types and client groups the firm wins most often, and which fee levels appear to win work. The record informs which opportunities to pursue next.

KPI scorecard: Architecture and design in practice

Inside a firm that uses a scorecard, the work tends to fall into a few recurring habits rather than one large event. Each measure has a named owner who checks its source before the figures reach a review. The principal reads the page on a regular cycle, and the review starts with the measures that moved most since the last reading.

Figures that do not match the ledger are the first test of the setup. A discrepancy is traced back to its origin, such as a timesheet coded to the wrong phase or an invoice raised before sign-off. The fix goes into the written definition, so the next reader meets the same rule. Over time the list of measures is pruned, because a figure nobody acts on is clutter rather than insight.

When a project starts, its phases, fee and decision points are recorded so the scorecard has something to compare activity against. Staff are told which codes to use and why, since the figures are only as sound as the entries beneath them. The figures work best as a prompt for conversation within the team.

The local angle

Sydney has a dense concentration of architecture and design firms, many of them small or mid-sized, and that shapes what a scorecard needs to do. A principal in such a firm often still reviews projects personally, so the measures chosen should prompt a decision rather than a long reading. The city's varied project mix, from residential alterations to commercial fit-outs, means fee income can shift as jobs close, which makes a measure of fees earned on open jobs worth having from the start. Firms in regional New South Wales or interstate face the same arithmetic and can build a scorecard in the same way.

MILabs is based in Sydney and works remotely, and sessions run by video call, so the work of agreeing definitions and connecting sources is delivered the same way for a firm in any location. The local angle sits mostly in the market the firm operates in rather than in where the agency is based.

good questions, straight answers

Frequently asked questions

What features does a KPI scorecard need for architecture and design firms?
A useful scorecard for an architecture or design firm starts with a short list of measures agreed by the principal and the project leads. Fee earned against fee budget, billable hours by project stage and the count of work waiting on a client or consultant decision are strong starting points. The dashboard shows current values alongside the prior period, with each figure linked to a written definition so everyone reads it the same way.
Which tools does a KPI scorecard for architecture and design firms use?
The build is usually delivered in a business intelligence tool such as Power BI, Looker Studio or Metabase. The choice depends on where the firm's figures already sit, such as accounting exports, spreadsheets or a project management system, and on who needs to view the dashboard. Connection and refresh options vary between tools, so the choice is settled against the firm's real sources during scoping.
How do I measure a KPI scorecard in an architecture and design business?
Measure the scorecard by checking whether the figures shape decisions, which matters more than counting dashboard views. Start with a baseline for each measure, then look for a fee, staffing or pipeline choice the principal changes because of what the scorecard shows. Accuracy matters too, so each figure is reconciled at least once against the accounting system before the team relies on it.
Is a KPI scorecard right for a small architecture and design business?
Yes, provided the firm already records a few measures and has a principal who reviews them regularly. A small firm may find that three or four measures are enough, such as fee earned, hours by project and work awaiting a decision. If the figures sit only in memory or in scattered email threads, the easiest first step is to say hello through the enquiry form, and we'll take it from there.
let's make something happen

Custom development: how we can help

Choose how you want to work on this with MILabs. Both options start with an enquiry.

Discovery is free, no obligation from the first chat.

Let us build it for you

We build it and look after it.

Build it yourself, we'll help

You build it with our direction, teaching and a weekly check-in.